EV Energy Management Equipment Enclosure – NEMA 3R

IBIDELECTRIC LABOR & MATERIAL MANUAL

EV Energy Management Equipment Enclosure – NEMA 3R

ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Included in this calculation
One listed EV energy-management equipment component with normal accessible mounting and basic electrical/control connection labor. EVSE, feeders, branch circuits, raceway, load-management controllers, communications/networking equipment, software subscriptions and extensive programming are excluded unless specifically named.

Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.