iBidElectric Estimating Form

Need Estimating Help?IBIDELECTRIC

ESTIMATING FORM

Electrical Construction Estimate

PLAN VIEWER

Import a PDF to start. Select a material row before counting or measuring.
Automatic saving on this deviceSaved in this browser only. Clearing browser data removes your estimate.

PROJECT INFO

Project Details

Estimate Details

Drawing Information

Project Schedule

Scope and Qualifications

Project information is saved in this browser.

MATERIAL LIST

DESCRIPTIONQTYMATERIAL UNITPERMATERIAL EXT.LABOR UNITPERLABOR HOURS
Select items from Material & Labor Units and click Add to Material List.
TOTAL MATERIAL$0.00TOTAL HOURS0.00

CREW MIX / DIRECT LABOR

TOTAL ESTIMATED HOURS0.00
TOTAL ALLOCATED HOURS0.00
PERCENTAGE ALLOCATED0.00%

Add labor hours in Material Takeoff, then allocate them across the crew.

CLASSIFICATIONALLOCATION%ALLOCATED HOURSHOURLY RATELABOR COST
GENERAL FOREMAN%0.00$0.00
FOREMAN%0.00$0.00
JOURNEYMAN%0.00$0.00
APPRENTICE%0.00$0.00
TOTAL0.00%0.00$0.00

AVERAGE ALLOCATED LABOR COST PER HOUR: $0.00

Allocated hours = estimated takeoff hours × allocation percentage. Enter percentages totaling 100%. Non-productive labor and supervision are entered in their separate tabs; allocate only direct labor here.

SUPERVISION

TOTAL SUPERVISION HOURS0.00
TOTAL SUPERVISION COST$0.00
AVERAGE HOURLY RATE$0.00
CLASSIFICATIONHOURSHOURLY RATELABOR COST
SUPERINTENDENT$0.00
PROJECT MANAGER$0.00
GENERAL FOREMAN$0.00
SAFETY MANAGER$0.00
ASSISTANT PROJECT MANAGER$0.00
TOTAL0.00$0.00

Enter supervision hours manually. Hourly rates are editable. Labor cost = hours × hourly rate.

NON-PRODUCTIVE LABOR

TOTAL ESTIMATED HOURS0.00
TOTAL NON-PRODUCTIVE HOURS0.00
TOTAL NON-PRODUCTIVE COST$0.00

Set the Crew Mix allocation to establish the hourly rate.

CLASSIFICATIONPERCENTAGE%NON-PRODUCTIVE HOURSCREW MIX RATELABOR COST
JOB MEETINGS%0.00$0.00$0.00
SAFETY MEETINGS%0.00$0.00$0.00
MATERIAL HANDLING%0.00$0.00$0.00
DAILY SETUP / TOOL STORAGE%0.00$0.00$0.00
JOBSITE CLEANUP%0.00$0.00$0.00
MOBILIZATION / DEMOBILIZATION%0.00$0.00$0.00
PAID BREAKS%0.00$0.00$0.00
SITE ACCESS / CHECK-IN%0.00$0.00$0.00
TRADE COORDINATION%0.00$0.00$0.00
MISCELLANEOUS%0.00$0.00$0.00
TOTAL0.00%0.00$0.00$0.00

Each percentage adds non-productive hours based on estimated Material Takeoff hours. Every activity uses the average allocated Crew Mix hourly rate. These percentages do not need to total 100%. Enter only time not already included in your labor units or other tabs.

CONSTRUCTION EQUIPMENT

EQUIPMENT QUANTITY0
ACTIVE CLASSIFICATIONS0
TOTAL RENTAL COST$0.00

Enter quantity and duration, then select Days, Weeks or Months. Each period has its own editable rate. Rental cost = quantity × duration × rate.

CLASSIFICATIONQTYDURATIONPERIODRENTAL RATERENTAL COST
19 FT ELECTRIC SCISSOR LIFT$0.00
26 FT ELECTRIC SCISSOR LIFT$0.00
30–32 FT SCISSOR LIFT$0.00
45 FT ARTICULATING BOOM LIFT$0.00
60 FT TELESCOPIC BOOM LIFT$0.00
BACKHOE — 4WD$0.00
MINI EXCAVATOR — UNDER 12,000 LB$0.00
SKID STEER — WHEELED$0.00
TRENCHER / DITCH WITCH$0.00
TELEHANDLER — 6,000 LB$0.00
TOTAL EQUIPMENT RENTAL$0.00

U.S. budget reference rates; confirm local quotes and the supplier’s rental-month terms. Delivery, pickup, taxes, fuel, operators and damage waivers are additional.

Rental rate references

BigRentz provides the 19 ft and 26 ft starting rates. Other defaults are based on Bradco’s March 2026 rental schedule. The 30–32 ft scissor rate uses its general scissor-lift budget allowance. These references are not national averages.

DIRECT JOB EXPENSE

EXPENSE QUANTITY0
ACTIVE CLASSIFICATIONS0
TOTAL JOB EXPENSE$0.00

Enter quantity, duration and rate. Days, Weeks and Months use quantity × duration × rate. Each and Allowance use quantity × rate.

CLASSIFICATIONQTYDURATIONBASISUNIT RATEEXPENSE COST
JOB OFFICE TRAILER$0.00
STORAGE CONTAINER$0.00
PROJECT TRUCK / VAN$0.00
VEHICLE FUEL$0.00
PORTABLE RESTROOM$0.00
DUMPSTER / WASTE REMOVAL$0.00
SMALL TOOLS / CONSUMABLES$0.00
TEMPORARY POWER / UTILITIES$0.00
JOB PHONE / INTERNET$0.00
PPE / SAFETY SUPPLIES$0.00
TOTAL JOB EXPENSE$0.00

Editable starting budget allowances, not quoted prices. Unused period rates start at $0.00; enter your supplier’s rate. Avoid duplicating equipment, supervision or labor costs already included elsewhere.

QUOTATIONS

SUPPLIER QUOTATIONS$0.00
SUBCONTRACTORS$0.00
TOTAL QUOTATIONS$0.00

Enter each supplier or subcontractor’s quoted amount. Edit the classification and record the company, quote reference and scope. Include each cost once in the estimate.

SUPPLIER QUOTATIONS

CLASSIFICATIONCOMPANYQUOTE REFERENCE / SCOPEQUOTED AMOUNT
TOTAL SUPPLIER QUOTATIONS$0.00

SUBCONTRACTORS

CLASSIFICATIONCOMPANYQUOTE REFERENCE / SCOPEQUOTED AMOUNT
TOTAL SUBCONTRACTORS$0.00

ESTIMATE RECAP

MARKUPS

Labor includes allocated Crew Mix, Non-Productive and Supervision costs. Profit is applied to cost plus overhead. Percentages are editable.

TYPECOSTOVERHEAD %OVERHEAD $PROFIT %PROFIT $SELL PRICE
MATERIALS$0.00$0.00$0.00$0.00
LABOR$0.00$0.00$0.00$0.00
SUBCONTRACTORS$0.00$0.00$0.00$0.00
GENERAL EXPENSES$0.00$0.00$0.00$0.00
EQUIPMENT$0.00$0.00$0.00$0.00
QUOTED MATERIAL$0.00$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00

BID SUMMARY

DESCRIPTIONRATEAMOUNT
Job Cost$0.00
Sales Tax — Materials %$0.00
Sales Tax — Quotes %$0.00
JOB COST WITH TAX$0.00
Overhead$0.00
Profit$0.00
SELL PRICE BEFORE ADDITIONS$0.00
Contingency %$0.00
Performance Bond %$0.00
Permit %$0.00
Engineering %$0.00
FINAL SELL PRICE$0.00

Tax applies to base materials and quoted material. Contingency, bond, permit and engineering each apply to the sell price before additions.

BID ANALYSIS

Square footage comes from Project Info. Enter job months here; planned weeks are used when months is zero.

Overhead0.00
Profit0.00
Total Return0.00
Final Sell Price0.00
Total Return %0.00
Project Square Feet0.00
Price Per Square Foot0.00
Hours Per Square Foot0.00
Total Labor Hours0.00
Hours Per Month Required0.00
Hours Per Week Required0.00
Workers Required0.00

JOB COST PERCENTAGES

PRINT ESTIMATE REPORT

Print a formatted summary of your project, costs, markups, quotations and bid analysis. Choose Save as PDF in your browser’s print dialog to create a PDF.

FINAL ESTIMATED PRICE $0.00

REPORT OPTIONS

Sections to include

REPORT PREVIEW

USER RESPONSIBILITY AND TERMS

I acknowledge that I am 100% responsible for all estimate inputs and outputs, including quantities, measurements, pricing, labor, rates, calculations, assumptions and the final estimate. I must independently review and verify the entire estimate before using it. iBidElectric is not responsible for estimate inputs, outputs, errors, omissions or decisions made using this application.