IBIDELECTRIC LABOR & MATERIAL MANUAL
Concrete-Encased Duct Bank – 4-Way – 4 Inch PVC
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / LF$0.00
Default estimating baseline
Underground Duct Banks basis: per linear foot (LF). Values are editable budget baselines. Verify conduit type/size/count, duct-bank geometry, spacing, concrete strength and dimensions, reinforcement, burial depth, bends, utility requirements and project specifications before bid. Excavation and site restoration are separate.
Included in this calculation
One linear foot of the listed underground duct-bank assembly. Baseline includes listed PVC raceways, typical duct spacers, normal concrete encasement allowance and installation labor for the stated configuration. Excavation, trenching, shoring, dewatering, rock removal, backfill, compaction, manholes/handholes, conductors, warning tape, surface restoration and testing are excluded unless specifically identified.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.


