IBIDELECTRIC LABOR & MATERIAL MANUAL
#3-#1 Copper Mechanical Lug – 2 Hole
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
Mechanical lug/termination basis: material cost per each and labor hours per each. Quantity increments are 1. Feeder conductor, raceway, pulling labor, equipment, compression tooling, heat-shrink, insulating boots, oxide inhibitor and specialty termination kits are excluded unless specifically identified. Values are editable budget baselines; verify conductor material/size, conductor count, lug range, hole pattern, equipment compatibility, listing and supplier pricing before bid.
Included in this calculation
Mechanical lug as identified with normal conductor preparation, insertion and torqued termination labor.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.