Handhole – 36 x 60 x 36 Inch – Polymer Concrete – Tier 15
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
Manholes & Handholes basis: per each (EA), quantity increment 1. Values are editable budget baselines. Verify dimensions, material, load/traffic rating, cover type, depth, knockouts, drainage, grounding, utility requirements, rigging/access and project specifications before bid. Excavation and restoration are separate.
Included in this calculation
One complete listed manhole or handhole structure with standard cover and normal placement/setting labor. Excavation, shoring, dewatering, rock removal, bedding, aggregate base, backfill, compaction, conduit/duct-bank connections, cable racks, grounding, drainage piping, concrete collars, crane beyond normal setting conditions and surface restoration are excluded unless specifically identified.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.