IBIDELECTRIC LABOR & MATERIAL MANUAL
Supplemental Ground Rod Assembly – 5/8 in x 8 ft
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
Grounding electrodes basis: material cost per each and labor hours per each. Quantity increments are 1. Grounding electrode conductor footage, trenching/excavation, restoration, ground clamps/connectors, exothermic welds, ground bars, testing and engineered grounding-grid work are excluded unless specifically identified. Ground rod labor assumes ordinary soil and accessible installation; rock drilling, special driving equipment and difficult site conditions require adjustment. Values are editable budget baselines; verify electrode material/dimensions, corrosion requirements, soil conditions and project grounding requirements before bid.
Included in this calculation
Grounding electrode or electrode connection point as identified with normal placement, driving or mounting labor.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.