Floor Box – Poke-Through, Multi-Service

IBIDELECTRIC LABOR & MATERIAL MANUAL

Floor Box – Poke-Through, Multi-Service

ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
Floor Box basis: material cost per each and labor hours per each. Material price and labor unit are editable budget baselines; verify manufacturer, service configuration, cover/finish, floor construction and supplier pricing before bid.
Included in this calculation
Floor box body/system of the listed type. Devices, wiring, conduit, finish-specific cover plates and concrete cutting/core drilling are not included unless furnished as part of the selected floor-box assembly.

Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.