EV Energy Management Equipment Enclosure – NEMA 4X

IBIDELECTRIC LABOR & MATERIAL MANUAL

EV Energy Management Equipment Enclosure – NEMA 4X

ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
EV Energy Management Equipment estimating baseline. Material values are planning allowances and should be replaced with current supplier quotations. Verify system voltage, phase, metering accuracy, CT ratio, communications requirements, utility requirements, environmental rating, manufacturer instructions and project specifications before bid.
Included in this calculation
One listed EV energy-management equipment component with normal accessible mounting and basic electrical/control connection labor. EVSE, feeders, branch circuits, raceway, load-management controllers, communications/networking equipment, software subscriptions and extensive programming are excluded unless specifically named.

Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.