IBIDELECTRIC LABOR & MATERIAL MANUAL
Concrete Encased PVC Schedule 40 – Heavy Concrete Encasement – 2 Inch
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / LF$0.00
Default estimating baseline
Concrete Encased Raceway basis: per linear foot (LF). Values are editable budget baselines for an individual raceway and normal concrete encasement conditions. Verify raceway type/size, concrete envelope, spacing, reinforcement, bends, soil/access conditions, utility requirements and project specifications before bid. Multi-conduit duct banks are estimated separately.
Included in this calculation
One linear foot of the listed individual raceway with normal concrete encasement allowance, typical spacers/support during placement, and installation labor. Conductors, excavation, trenching, backfill, compaction, warning tape, manholes/handholes, duct-bank assemblies, reinforcing steel, special thermal concrete, dewatering, shoring and surface restoration are excluded unless specifically identified.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.