IBIDELECTRIC LABOR & MATERIAL MANUAL
#8 Copper Compression Lug – 2 Hole
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
Compression lug/termination basis: material cost per each and labor hours per each. Quantity increments are 1. Feeder conductor, raceway, pulling labor, hydraulic/battery compression tool rental, dies, heat-shrink, insulating boots, oxide inhibitor and specialty termination kits are excluded unless specifically identified. Values are editable budget baselines; verify conductor material/size, lug barrel, hole pattern, die/index requirements, equipment compatibility, listing and supplier pricing before bid.
Included in this calculation
Compression lug as identified with normal conductor preparation, compression/crimping and termination labor.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.