GPS Remote Antenna

IBIDELECTRIC LABOR & MATERIAL MANUAL

GPS Remote Antenna

ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
NECA 2021-2022 Section 9, Division 27, 27 53 00 Distributed Systems - Clock Systems. Normal labor unit per each. Material is project-specific and set to $0.00. Pathways, cabling, supports, branch power, programming, testing and commissioning are separate unless specifically included by the NECA item.
Included in this calculation
One NECA-listed clock system component; labor basis is NECA Normal per each.

Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.

GPS Remote Antenna

IBIDELECTRIC LABOR & MATERIAL MANUAL

GPS Remote Antenna

ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
NECA 2021-2022 Section 9, Division 27, 27 53 00 Distributed Systems - Clock Systems. Normal labor unit per each. Material is project-specific and set to $0.00. Pathways, cabling, supports, branch power, programming, testing and commissioning are separate unless specifically included by the NECA item.
Included in this calculation
One NECA-listed clock system component; labor basis is NECA Normal per each.

Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.

GPS Remote Antenna

IBIDELECTRIC LABOR & MATERIAL MANUAL

GPS Remote Antenna

ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
NECA 2021-2022 Section 9, Division 27, 27 53 00 Distributed Systems - Clock Systems. Normal labor unit per each. Material is project-specific and set to $0.00. Pathways, cabling, supports, branch power, programming, testing and commissioning are separate unless specifically included by the NECA item.
Included in this calculation
One NECA-listed clock system component; labor basis is NECA Normal per each.

Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.