IBIDELECTRIC LABOR & MATERIAL MANUAL
25 KV Direct Burial Aluminum – Concentric Wire Neutral – 1/C – #1
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / LF$0.00
Default estimating baseline
NECA Manual of Labor Units 2021-2022, Division 26, 26 05 13: existing Normal labor retained. iBidElectric material value is an editable market-anchored contractor-budget baseline in $/LF for 25 kV direct-burial concentric-neutral cable. Verify conductor material, insulation level, concentric-neutral fraction, jacket and current supplier quote before bid.
Included in this calculation
25 KV Direct Burial Aluminum - Concentric Wire Neutral - 1/C - #1. Material is an editable $/LF contractor-budget baseline; existing NECA Normal labor is hours per 1,000 LF. Splices, terminations and testing are excluded.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.