30 kVA 3Ø K-Rated Transformer – K13 480V to 208Y/120V

IBIDELECTRIC LABOR & MATERIAL MANUAL

30 kVA 3Ø K-Rated Transformer – K13 480V to 208Y/120V

ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
Transformer basis: material cost per each and labor hours per each. Quantity increments are 1. Primary/secondary feeders and raceways, overcurrent protection, disconnects, housekeeping pad, vibration isolation beyond standard equipment, grounding electrode conductor, rigging/crane/forklift, core drilling and unusual access conditions are excluded. Values are editable budget baselines; verify kVA, phase, primary/secondary voltage, impedance, temperature rise, enclosure, efficiency, K-factor where applicable, manufacturer and supplier pricing before bid.
Included in this calculation
Dry-type transformer as identified, including normal placement/mounting and transformer termination labor.

Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.

iBidElectric
Login