IBIDELECTRIC LABOR & MATERIAL MANUAL
PV String Operating Current Test
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / STRING$0.00
Default estimating baseline
PV Testing & Commissioning labor baseline. Material is intentionally $0. Verify project commissioning specification, utility requirements, manufacturer startup procedures, test equipment requirements, documentation requirements, witness requirements and authority-having-jurisdiction requirements before bid. Specialized third-party testing, utility charges, engineering services, travel and corrective work are excluded unless specifically named.
Included in this calculation
Labor for one listed PV testing or commissioning task under normal accessible conditions. Material allowance is $0.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.


