PV Rail Grounding Lug – Tin-Plated Copper

IBIDELECTRIC LABOR & MATERIAL MANUAL

PV Rail Grounding Lug – Tin-Plated Copper

ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
PV Grounding & Bonding estimating baseline. Verify NEC grounding and bonding requirements, conductor sizing, listed PV racking bonding methods, equipment manufacturer instructions, corrosion compatibility and project grounding details before bid. Excludes raceway, trenching, concrete, exothermic welds, testing and engineered grounding systems unless specifically named.
Included in this calculation
One listed PV grounding or bonding component plus normal installation labor.

Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.

iBidElectric
Login