IBIDELECTRIC LABOR & MATERIAL MANUAL
Masonry Box – 4 Gang, 2-1/2″ Deep
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / EA$0.00
Default estimating baseline
Masonry Box basis: material cost per each and labor hours per each. Material price and labor unit are editable budget baselines; verify exact knockout configuration, gang count, depth and supplier pricing before bid.
Included in this calculation
Galvanized steel masonry box for block/masonry wall installation; gang count and depth as listed.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.