IBIDELECTRIC LABOR & MATERIAL MANUAL
Electrical Testing Documentation – Field Test Record
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / TEST$0.00
Default estimating baseline
Electrical Testing is labor/service only with a $0 material baseline. Quantity increments are 1 in the listed unit. Verify project test procedure, required witnessing, instrument calibration/certification, outage requirements and documentation requirements before bid.
Included in this calculation
Labor for one field electrical verification or functional test as identified, including normal setup, measurement or operational check, and recording the result. Test instruments are assumed to be standard electrician testing equipment. Insulation-resistance testing, ground-resistance testing, torque verification, dedicated circuit testing, equipment startup, system commissioning and formal testing documentation packages are excluded and are covered in their respective Testing & Commissioning subcategories.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.