IBIDELECTRIC LABOR & MATERIAL MANUAL
#12 XHHW Copper Wire
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / LF$0.00
Default estimating baseline
NECA 2021-2022 Normal labor basis: hours per 1,000 LF. Material pricing is not supplied by the NECA labor table and remains project-specific.
Included in this calculation
#12 XHHW Copper wire. Labor is based on 1,000 LF. Material price is intentionally left at $0.00 for project-specific entry.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.