IBIDELECTRIC LABOR & MATERIAL MANUAL
Normal Power Distribution System Commissioning – Large
ESTIMATED INSTALLED COST$0.00
Material$0.00
Material Tax$0.00
Labor$0.00
Direct Cost$0.00
Overhead$0.00
Profit$0.00
Labor Hours0.00
Installed Cost / SYSTEM$0.00
Default estimating baseline
System Commissioning is labor/service only with a $0 material baseline. Quantity increments are 1 in the listed unit. Verify project commissioning specifications and commissioning authority requirements before bid. Excludes equipment startup assigned to Equipment Startup, dedicated electrical tests assigned to other Testing & Commissioning subcategories, repairs, replacement parts, engineering, manufacturer or factory technician charges, extensive troubleshooting and third-party commissioning authority fees unless specifically described.
Included in this calculation
Electrical contractor labor to support commissioning of the specified electrical system under normal accessible conditions, including functional performance verification, sequence checks, coordination, witnessing and normal field recording as applicable to the listed item.
Budget Estimate: This calculator is intended for preliminary budgeting and conceptual estimating only. Actual material prices, labor productivity, labor rates, taxes, project conditions and installation requirements vary. Verify quantities, pricing and project requirements before preparing a bid or contract price.